Skip to main content
Home
Close Tracker Map 

Main navigation

About
About
About GEM

What is a tracker?

People

Careers

Financial information

Contact us

Our impact

Annual reports

Partners

Who uses GEM research

Support our work

Subscribe

Give now

Funders and donors

Browse data
Trackers
Oil and gas

Oil and gas plants

Oil and gas extraction

Oil infrastructure

Gas infrastructure

Coal

Coal plants

Coal mines

Coal terminals

Renewables and other power

Solar

Wind

Hydropower

Geothermal

Bioenergy

Nuclear

Heavy industry

Iron and steel

Cement and concrete

Iron ore mines

Chemicals inventory

Finance and corporates

Energy ownership

Private equity

Coal project finance

Gas project finance

Energy transition

Integrated power

Global energy transition

Methane emitters

Latin America energy

Energy monitor wiki

Insights and updates
Insights and updates
Insights
Reports and briefings

Updates
Press releases

In the news

Newsletters
Coal Wire

Inside Gas


Search
Download data
Home
October 2022
Press release
Coal
India

India’s 99 new coal mine projects conflict with net zero by 2070

Share on:
   

A temporary coal shortage has emboldened the Indian government to press ahead with plans to develop 99 new coal projects with production of 427 million tonnes per year (mtpa), according to a briefing by Global Energy Monitor (GEM). Land for new coal projects continues to be auctioned despite the government’s pledge to achieve net zero emissions by 2070 and despite the fact that 36% of capacity at operating mines goes unused.

Key findings:

  • Underutilized capacity at India’s existing mines (433 mtpa) is actually greater than projected capacity from India’s 99 new coal projects (427 mtpa), demonstrating that these new projects are unneeded.
  • India’s 427 mtpa of planned new coal mine capacity place it second in the world after China with 596 mtpa.
  • In some major mining regions, like Jharkhand and Odisha, the industry has over 100 million tonnes in unused capacity at active mine sites, amounting to over 40% of unused mine capacity in those states.
  • New mines would not open fast enough to meet coal demand in the short-term, and would be hampered by the same problems as existing mines, such as low labor productivity, competition from renewables, land acquisition issues, and infrastructure constraints.
  • The 99 new coal projects threaten to displace at least 165 villages and affect 87,630 families, of which 41,508 families live in scheduled areas of India (PESA), which have a predominant population of tribal communities.
  • Water shortages would be exacerbated by the new coal projects, increasing demand by 168,041 kiloliters per day. Of 427 mtpa in new capacity, 159 mtpa (37%) will be located in high risk water zones, while 230 mtpa (54%) is planned for extremely high water risk zones.

“The signs warning against the massive expansion of coal mining are easy to see, but the Indian government is not heeding them,” said Ryan Driskell Tate, Project Manager for GEM’s Global Coal Mine Tracker. “New mines can’t make the industry’s old problems go away. The irony of this expansion is that opening new mines today could intensify the sector’s weaknesses and inefficiencies tomorrow, especially as competition from renewables and conflicts over land use continue to emerge.”

GEM’s findings are based on data from its Global Coal Mine Tracker and a review of regulatory information and corporate annual reports.

Tracker
Global Coal Mine Tracker

Open tracker

In the news
India’s 99 new coal mine projects in conflict with net zero goals
October 2022

The Times of India

Read In the news

Report
Why India’s New Coal Mines Won’t Solve its Power Crisis
October 2022

By Ryan Driskell Tate, Tiffany Means, Medha Kapoor

Read Report


Subscribe to stay informed about our latest work and updates

Join our mailing list

Subscribe to stay informed about our latest work and updates

Join our mailing list

Footer

Browse data
Oil and gas Coal Renewables and other power Heavy industry Finance and corporates Energy transition
Insights and updates
Reports and briefings Press releases In the news Coal Wire Inside Gas
About
What is a tracker? People Financial information Careers Contact Us
© 2026 Global Energy Monitor
All Rights Reserved
440 N Barranca Ave #2878, Covina, CA 91723
Built by 89up
   