Skip to main content
Home
Close Tracker Map 

Main navigation

About
About
About GEM

What is a tracker?

People

Careers

Financial information

Contact us

Our impact

Annual reports

Partners

Who uses GEM research

Support our work

Subscribe

Give now

Funders and donors

Browse data
Trackers
Oil and gas

Oil and gas plants

Oil and gas extraction

Oil infrastructure

Gas infrastructure

Coal

Coal plants

Coal mines

Coal terminals

Renewables and other power

Solar

Wind

Hydropower

Geothermal

Bioenergy

Nuclear

Heavy industry

Iron and steel

Cement and concrete

Iron ore mines

Chemicals inventory

Finance and corporates

Energy ownership

Private equity

Coal project finance

Gas project finance

Energy transition

Integrated power

Global energy transition

Methane emitters

Latin America energy

Energy monitor wiki

Insights and updates
Insights and updates
Insights
Reports and briefings

Updates
Press releases

In the news

Newsletters
Coal Wire

Inside Gas


Search
Download data
Home
February 2022
Press release
Oil and gas

Global gas pipeline build-out threatens climate goals, creates US$485 billion stranded asset risk

By Baird Langenbrunner
Share on:
   

A massive expansion of the global gas pipeline network threatens climate goals and creates a US$485.8 billion stranded asset risk, according to a new survey by Global Energy Monitor (GEM). After a Covid-19-related drop in pipeline commissionings in 2021, the gas industry and gas-positive countries led by China, India, Russia, Australia, and the United States are pushing ahead with plans to commission tens of thousands of kilometers (km) of gas pipelines in 2022.

This expansion is occurring despite the International Energy Agency (IEA) warning that gas usage must peak within the next few years and that the world must quickly transition from fossil fuels to renewables. For 2021, GEM’s survey found that cancellations and delays in some parts of the world were offset by rapid expansions elsewhere, particularly in Asian countries, perpetuating a dangerous status quo incompatible with the IEA's 1.5 ºC net-zero scenario.

Executive Summary

  • Globally there are 70,900 kilometers (km) of pipelines in construction, with an additional 122,500 km in pre-construction development. Together these would cost an estimated US$485.8 billion in capital expenditure.
  • In 2021, global pipeline commissionings fell to 6,500 km, their lowest level since 1996, but much of this decline was due to the economic and logistical chaos caused by the Covid-19 pandemic. With 36,800 km under construction and scheduled to be commissioned in 2022, and a further 59,500 km scheduled to be commissioned between 2023–2030, the global gas network is poised for a large, rapid expansion.
  • China leads the globe in gas pipeline development, with 26,300 km of gas transmission pipelines in construction and an additional 29,800 km in pre-construction development, amounting to a total stranded asset risk of US$89.1 billion. The Chinese pipeline boom is happening under the direction of the newly created conglomerate PipeChina, the world’s second-largest developer of gas pipelines behind Russia’s Gazprom.
  • India ranks second among global leaders in gas pipeline development, with 16,200 km under construction and a further 2,200 km that have been proposed, representing a stranded asset risk of US$14.7 billion.
  • Sticking to its 2020 plan for a “gas-fired recovery” from the Covid-19 pandemic, Australia is developing 12,200 km of gas pipelines, though just 600 km are currently under construction. These pipelines represent an estimated stranded asset risk of US$18.6 billion.
  • In the U.S., rising opposition from NGOs and activists and a shifting legal and regulatory landscape contributed to the defeat of several high-profile pipelines in 2020–21; however there are still pipelines costing an estimated US$47.6 billion being developed, and the U.S. is expected to become the world’s leading exporter of gas in 2022.

“A slowdown in gas pipeline development in 2021 was unfortunately more about Covid than a recognition that gas is contributing to the climate crisis,” said Baird Langenbrunner, a research analyst at GEM. “Looking ahead, the fact that nearly half-a-trillion dollars of gas pipelines are in development make no sense economically as many of these projects will become stranded assets as the world transitions to renewables.”

Tracker
Global Gas Infrastructure Tracker

Open tracker

Report
Pipe Dreams '22: Stranded Assets and Magical Thinking in the Proposed Global Gas Pipeline Buildout
February 2022

By Baird Langenbrunner, Julie Joly, Greig Aitken

Read Report


Subscribe to stay informed about our latest work and updates

Join our mailing list

Subscribe to stay informed about our latest work and updates

Join our mailing list

Footer

Browse data
Oil and gas Coal Renewables and other power Heavy industry Finance and corporates Energy transition
Insights and updates
Reports and briefings Press releases In the news Coal Wire Inside Gas
About
What is a tracker? People Financial information Careers Contact Us
© 2026 Global Energy Monitor
All Rights Reserved
440 N Barranca Ave #2878, Covina, CA 91723
Built by 89up
   