Global Energy Monitor
Download the English version of “A Race to the Top Southeast Asia 2024: Operating solar and wind capacity in Southeast Asia grows by a fifth since last year, but only 3% of prospective projects are in construction”

A Race to the Top Southeast Asia 2024: Operating solar and wind capacity in Southeast Asia grows by a fifth since last year, but only 3% of prospective projects are in construction

  • Janna Smith, Kasandra O'Malia, Shradhey Prasad, Nassos Stylianou, and Ingrid Behrsin
Download the English version of “A Race to the Top Southeast Asia 2024: Operating solar and wind capacity in Southeast Asia grows by a fifth since last year, but only 3% of prospective projects are in construction”